Maurice Gibb Memorial Park

Maurice Gibb Memorial Park photos 008

Lunacon Construction Group led the major renovation of Maurice Gibb Memorial Park in Miami Beach, in partnership with Miami-Dade County. This transformative project began with the discovery of petroleum contamination on site, prompting a comprehensive soil and groundwater remediation effort. Working in close coordination with the Environmental Consultant and Miami-Dade County’s Division of Environmental Resources […]

South Dade Aquatic Center

001

Lunacon successfully completed a Design-Build project for Miami Dade County – a state-of-the-art aquatic facility. This comprehensive project encompassed both demolition and new construction. Key highlights include: Demolition and Site Preparation: We undertook the demolition of the existing aquatic center facility and north parking lot, preparing the site for the new construction. New Facility Construction: […]

Central Park Elementary School Renovations

Central Park Elementary 15 1

This project involves significant upgrades and renovations, and encompassed various enhancements to improve functionality and aesthetics. Key elements include: Walkway Reconstruction: We demolished the existing aluminum walkways and constructed new covered ones, providing better protection and accessibility. Building Envelope Improvements: Our work extended to the overall structure of the building, including: Painting the exterior for […]

Driftwood Middle School Renovation

Driftwood Middle School 26 1

This renovation project involved a series of important repairs and upgrades to enhance functionality and safety. Highlights of the work we completed include: Walkway Repairs and Replacement: We repaired and replaced existing galvanized steel walkways, ensuring durability and safety. Media Center Renovation: Our team modernized the media center, updating it to meet current needs and […]

William E. Dandy Middle School Renovation

09F75477 0330 483E 9E65 406E4DBC5EA2 min scaled 1

We’re proud to highlight our comprehensive renovation project at William Dandy Middle School, encompassing a wide range of improvements across 19 buildings. The project included: Re-Roofing Initiative: Our team undertook the demolition and reconstruction of existing roofing, installing bitumen built-up roofing systems. This included new roof insulation, flashing, trim, and related accessories. Roof Structure Reinforcement: […]

Oakland Park Elementary School Renovations

9.24.20 OPES 2 scaled

Lunacon at Oakland Park ES embarked on a critical project focused on improving the roof drainage, safety, and overall efficiency of the facility. Key aspects of this project include: Roofing System Upgrade: We installed a new modified bitumen built-up roofing system, ensuring a minimum insulation value of R-20 for enhanced energy efficiency. Structural Improvements: Our […]

Rehabilitate Flamingo Visitor Center

Untitled 64

We’re excited to share our involvement in the rehabilitation of the historic Mission66 era Visitor Center within Everglades National Park. This sensitive project was executed with utmost care, considering the surrounding national preserves and their endangered species. Key components of the project include: Sensitive Repurposing: We transformed the former Flamingo concession’s restaurant and gift shop […]

Maplewood Elementary School

Maplewood Elementary 5 1

Our project at Maplewoods ES Main involved a series of renovations and system upgrades to enhance the school’s functionality and safety. The scope of work included: Restroom Renovations: We renovated male and female group restrooms in buildings 159 and 160, modernizing the facilities. Fire Safety Upgrades: The project included installing new fire sprinklers in several […]

USPS Dock Expansion – Royal Palm

1B2D66B2 2E40 4090 A323 3E2954893D62 scaled

We successfully completed a construction project that involved creating 31 advanced loading positions with a range of features and site improvements. Key aspects of this project include: Loading Position Features: Each loading position is equipped with: Edge of Dock Levelers and Truck Restraints for efficient loading operations. A Dock Control Light System for safety and […]

Riverglades Elementary School

200311 Multivista 200122 Riverglades Elementary School UAV Roof Exact Built Roof Photo 5 1 min scaled

Our project at Riverglades Elementary School involved a series of essential repairs and upgrades across the campus. The project focused on enhancing safety, functionality, and aesthetics. Key components included: Walkway Repairs: Repair work was carried out on the aluminum covered walkways, ensuring safety and durability. Fire Safety System Overhaul: We replaced the entire fire alarm […]